Warning: Declaration of ET_Theme_Builder_Woocommerce_Product_Variable_Placeholder::get_available_variations() should be compatible with WC_Product_Variable::get_available_variations($return = 'array') in /www/wwwroot/hydraulic-coupling.com/wp-content/themes/Divi/includes/builder/frontend-builder/theme-builder/WoocommerceProductVariablePlaceholder.php on line 8
DUMP TRAILER Electrical power UNIT - hydraulic coupling

DUMP TRAILER Energy UNIT- SINGLE ACTING
Common Description
This power unit features a energy up gravity down circuit. Begin the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Guide override to solenoid valve could be supplied if needed. Also a strain compen sated flow management can be additional to the circuit to regulate the descent speed of the cylinder.
Remark: Please check with our revenue engineer for your various pump displacement, motor energy or tank capability.
Distinctive Notes
1. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
two. Clean all the hydraulic components concerned just before set up of the electrical power unit.
3. Viscosity from the hydraulic oil shoud be 15~46 cst,which ought to also be clean and absolutely free of impurities.N46 hydraulic oil is recommended.
4. The electrical power unit ought to be mounted horizontally.
5. Check the oil degree inside the tank soon after the first operating with the energy unit.
6. Oil modifying is required following the preliminary one hundred operation hrs, afterwards after each and every 3000 hours.

DUMP TRAILER Power UNIT-DOUBLE ACTING
General Description
This power unit has a electrical power up electrical power down circuit with load holding on both A & B ports. A stress compensatred movement management may be added to circuit to control the decent velocity in the cylinder.
Distinctive Notes
one. This energy unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
two. Clean all of the hydraulic components concerned in advance of installation of the energy unit.
3. Viscosity of the hydraulic oil shoud be 15~46 cst, which should really also be clean and no cost of impurities. N46 hydraulic oil is advised.
four. The electrical power unit ought to be mounted horizontally.
five. Check the oil level from the tank after the preliminary running of the electrical power unit.
6. Oil altering is needed right after the first a hundred operation hrs, afterwards the moment every 3000 hours.